Flange Brackets attach to the top of the crane runway beam with Girder Clamps. Flange brackets should be placed no more than 59" (1.5 M) apart.
Refer to the Safe-Lec 2 Manual for details.
***IMPORTANT INVENTORY NOTICE: 10/22 – 10/24***
Our manufacturing, shipping, and receiving locations will be closed for inventory from Wednesday, October 22nd, to Friday, October 24th. We will be unable to produce or ship orders during this time frame. Our sales offices will be open for regular business hours. If you have any questions, please get in touch with the factory at 800-521-4888 and then press one (1) for a customer service representative.
Flange Brackets attach to the top of the crane runway beam with Girder Clamps. Flange brackets should be placed no more than 59" (1.5 M) apart.
Refer to the Safe-Lec 2 Manual for details.
Follow Us: